Project Number:
Title:
Upper Columbia Land & Water Acquisition
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 25.00%
Methow 25.00%
Okanogan 25.00%
Wenatchee 25.00%
Contract Number:
73548 REL 93
Contract Title:
2008-104-00 EXP LAND & WATER ACQUISITION
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
This contract primarily encompasses preacquisition activities for land and water acquisitions  in the Okanogan, Methow, Entiat and Wenatchee subbasins. Securing lands in the aforementioned subbasins will protect habitat for ESA-listed salmonids including upper Columbia River (UCR) spring Chinook, UCR summer steelhead and bull trout. This habitat will also benefit non-listed species including summer Chinook, coho salmon, sockeye salmon, and Pacific lamprey.

Based upon available information, candidate parcels and will be prioritized using the Upper Columbia Biological Strategy and the recently released Upper Columbia Regional Technical Team – Habitat Action Prioritization within the Upper Columbia River Basin.  In both Okanogan and Methow River subbasins, Ecosystem Diagnosis and Treatment (EDT) information exists as well and will be used to prioritize areas for habitat protection. Other sources of information such as subbasin plans, limiting factors analysis, and empirical data (i.e. redd distribution, groundwater input, etc.) may also guide selection of properties to acquire. Priority will be given to parcels that currently contain high quality habitat but are in risk to be degraded due to development, as well as lands currently degraded but that were historically renowned as valuable for fish and have the opportunity to be restored. At this time the Colville Tribes do not propose to use funds from Project 2008-104-00 for post-acquisition restoration activities. Rather, appropriate restoration or habitat quality improvement projects shall use other sources of funding, potential sources of which are the state Salmon Recovery Funding Board, Priest Rapids Coordinating Committee Habitat Subcommittee, or Habitat Conservation Plan (HCP) Tributary Committee for both Douglas and Chelan County Public Utility Districts.

Some place holder-type work elements may seem redundant to contract 83391.  This is to ensure that, in the event that an unplanned-for or otherwise unforeseen water right which meets the prioritization schema for benefiting focal species of this contract becomes available for acquisition, funding is available to subcontract with QLEs and other parties as necessary to secure that right.

Funding in this CR is primarily intended for the purchasing of ‘paper’ water rights.  If funding would be considered in this CR for supportive infrastructure (e.g. contributions to construct pipelines, pump stations, efficient irrigation systems, etc.) to increase the biological benefit of a project, BPA and the CTCR shall arrive at a mutual consensus.  During this contract period the Habitat Categorical Review, ISRP science review and Council process will commence in November, and if the CTCR intends to make supported infrastructure to be a permanent part of project 2008-104-00, the review process will provide the appropriate opportunity for BPA, NPCC, and ISRP to evaluate the project proposal.

Lastly, work authorized under this CR will assemble the full proposal for the North West Power and Conservation Council (NPCC) and to the Independent Scientific Review Panel (ISRP) beginning in November 2020 and continuing into Feb/March 2021.  Presentation to NPCC and ISRP in 2021 may be possible.

Account Type(s):
Expense
Contract Start Date:
07/01/2020
Contract End Date:
06/30/2021
Current Contract Value:
$87,286
Expenditures:
$87,286

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental clearances received B: 165. CCT - Environmental Compliance 06/30/2021 06/30/2021
Manage and administer Project C: 119. Manage BPA Contracting Requirements 06/30/2021 06/30/2021
Pre-Acquisition Activities D: 172. Conduct Appraisals, Boundary Line Assessments environmental assessments, etc. of potential property purchases 06/30/2021 06/30/2021
Water transactions and associated documentation E: 154. Develop water rights transactions 06/30/2021 06/30/2021
Develop or update (out-year) prioritized Acquisition list: upload to cbfish F: 114. Work throughout the Upper Columbia to Identify and Select Land and Water Acquisition Projects 06/30/2021 06/30/2021
Cultural Resource Surveys for habitat improvement projects G: 165. Cultural Resource Surveys 06/30/2021 06/30/2021
Upper Columbia River Basins in-stream flow acquisition H: 164. Upper Columbia Basin Water acquisition 06/30/2021 06/30/2021
Deliverable: Receipt of NPCC recommendation for Anadromous Fish Habitat and Artificial Production Review J: 141. Other Reports for BPA 06/30/2021 05/03/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 154 Develop and Negotiate Water Right Transaction
  • 1 instance of WE 164 Acquire Water Instream
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
Sockeye (O. nerka) - Okanogan River ESU
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 154 Develop and Negotiate Water Right Transaction
  • 1 instance of WE 164 Acquire Water Instream
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 154 Develop and Negotiate Water Right Transaction

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 CCT - Environmental Compliance
C 119 Manage BPA Contracting Requirements
D 172 Conduct Appraisals, Boundary Line Assessments environmental assessments, etc. of potential property purchases
E 154 Develop water rights transactions
F 114 Work throughout the Upper Columbia to Identify and Select Land and Water Acquisition Projects
G 165 Cultural Resource Surveys
H 164 Upper Columbia Basin Water acquisition
I 132 No progress report required in this contract time period per COR
J 141 Other Reports for BPA